Case Studies

Medewiwin, Victoria

Year built: 1972 (addition in 2002)

Size: three-storey, 1390 m2

Wood-framed low-rise MURB; Natural gas DHW and hydronic heating

RFP issued by BC Housing

Dany Guincher, Vancouver

Year built: 1990

Size: three-storey, 770 m2

Wood-framed low-rise MURB; Natural gas DHW and hydronic heating

RFP issued by BC Housing

Crossroads Inn, Kamloops

Year built: 1994

Size: four-storey, 1340 m2

Concrete and steel, low-rise MURB; Natural gas DHW and hydronic heating

RFP issued by BC Housing

Manor House, City of North Vancouver

Year built: 1972

Size: three-storey, 3870 m2

Wood-framed low-rise MURB; Natural gas DHW and hydronic heating

RFP issued by Metro Vancouver Housing

Le Chateau, Coquitlam

Year built: 1980

Size: three-storey, 1770 m2

Wood-framed low-rise MURB; Natural gas DHW and hydronic heating

RFP issued by Metro Vancouver Housing

Crown Manor, New Westminster

Year built: 1964

Size: three-storey, 1770 m2

Wood-framed low-rise MURB; Natural gas DHW and hydronic heating

RFP issued by Metro Vancouver Housing

Stay in touch

Get the latest news about the Reframed Initiative.